The performance of EndoTherm was trialled by The Rotherham NHS Foundation Trust at The Park Rehabilitation Centre.

The installation followed a similar successful trial at the Oakwood Centre earlier in the year to reinforce the performance of EndoTherm as a solution to the trusts rising energy costs.

The centre has a small pool (10x5m) which is maintained at a constant 35°C. There is also a small weight gym and sports hall which is available to hire by the general public. The centre’s heating system is powered by two 205kW boilers and 2 large air handling units to heat the larger sports halls.

 

Results

Time Period Avg Usage / Degree Days (kWh)
Before 229.59
After 198.50

The monthly average usage/degree days from November 2013 until June 2014 were compared with the same readings for 14 months after installation. Degree days were taken from a nearby weather centre at Robin Hood Airport in Doncaster.
 

Compensated Saving:

13.54%

Total Cash Saving:

£2,215

Total CO2 Saving:

16 tonnes

 

“EndoTherm has been added to heating systems in 2 of our smaller properties for approx 2 years. The gas savings realised have been of the order of 10-13.5%. The results are there to be seen. When circumstances allow, this product will be added to the main site heating system. Everyone connected with the company has been friendly, professional and helpful at all times and a pleasure to deal with”

Estates Officer

Energy & Special Projects, The Rotherham NHS Foundation Trust