NHS Swansea Bay UHB - Singleton Hospital Day Surgery Unit

EndoTherm Energy Saving Case Study
Swansea, United Kingdom

The performance of EndoTherm was piloted by the NHS Swansea Bay UHB in the Singleton Hospital Day Surgery Unit.

The hospital building, built in 2005 and housing two operating theatres and a 24-bed recovery suite, with pre-assessment facilities and staff support spaces, is heated by 3 x 105kW boilers via steel panel radiators.

EndoTherm was installed in January 2020.

Reducing space heating consumption in hospitals, especially in day surgery units, is a challenging task due to the need for maintaining a comfortable and safe environment for patients, the continuous operation of medical equipment, extended operating hours, complex building structures, and compliance with strict regulations.

EndoTherm was able to demonstrate significant space heating energy saving at Singleton Hospital Day Surgery Unit despite these constraints. 

During the 12-month pilot using EndoTherm, Singleton Hospital Day Surgery Unit saved 18,085Kg of CO₂e. This carbon reduction is equivalent to:

Singleton Hospital Day Surgery Unit Carbon Emission Saving Equivalencies

Register to access a copy of the full case study...

Singleton-Hospital-Day-Surgery-Unit-EndoTherm-Case-Study-Document